Tommy Walsh's Eco House

-

Season 1

Overview

Can you build an eco-friendly home in 60 days for £60k? Builder Tommy Walsh decided to find out. Together with his building team, Walsh undertook the project in what he calls the worst summer in the past 50 years, although that might have been a good thing for what he calls the central feature of the house's eco-friendly aspect - a water harvesting tank, intended to supply water to the toilets, dishwasher and washing machine in the two-bedroom, two-storey house. Despite the deluge of rain, the team slogs on, aiming for the 60-day timeframe.

Episodes

1. Introduction
Oct 3, 2007

The DIY guru attempts to build an affordable eco-friendly home in 60 days with a limited budget.

0.0 25 min
2. Installing Rainwater-Harvesting Drainage System
Oct 10, 2007

The team installs the rainwater-harvesting drainage system, which supplies the toilets, washing machine and dishwasher.

0.0 25 min
3. Block-And-Beam Floor Delay
Oct 17, 2007

With the block-and-beam floor nowhere to be seen, the team tries to come up with a solution to allow the bricklayers to begin their work.

0.0 25 min
4. Damp-Proof Membrane & Thermal Blocks
Oct 24, 2007

To improve the house's energy efficiency, a damp-proof membrane is laid to prevent heat loss and thermal blocks are used instead of concrete increasing, the house's thermal efficiency.

0.0 25 min
5. First-Floor Joists & Timber Frame Roof
Oct 31, 2007

The joists for the first floor are installed along with the timber frame that forms the basis of the roof. And the team try to eat doughnuts without licking their lips.

0.0 25 min
6. Polyurethane Wall Insulation
Nov 7, 2007

Polyurethane wall insulation is added, and the team considers installing supportive wooden pegs called 'nogs'.

0.0 25 min
7. Roof Slates & Solar Panels
Nov 14, 2007

The roof slates and solar panels are fitted to the house, and the team learns the property will be the most energy-efficient in the Fens.

0.0 25 min
8. Exterior Cladding & Under-Floor Heating
Nov 21, 2007

The house starts to take shape as the exterior cladding is fitted and the under-floor heating is installed.

0.0 25 min
9. Rooms Boarded & Special Water Tank
Nov 28, 2007

The rooms are boarded in preparation for plastering, and a special water tank becomes the latest environmentally friendly addition to the project.

0.0 25 min
10. Completing The Project
Dec 5, 2007

With the deadline looming, there's still a lot to do. Tommy and the team work on the fitting the staircase, tiling, electrics and plumbing in a bid to complete the project.

0.0 25 min
View this project on GitHub: https://github.com/Manasess896/TMDB-Explorer