Hometime

-

Season 24

Episodes

1. Sculpture Studio Extension - Floor
Feb 6, 2010

The Hometime crew uses pavers and retaining walls to capture space under a second-story deck.

0.0 30 min
2. Sculpture Studio Extension - Walls
Feb 13, 2010

The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck.

0.0 30 min
3. Sculpture Studio Extension - Wrap Up
Feb 20, 2010

The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture.

0.0 30 min
4. Stone Cottage – Cul-De-Sac Prep
Feb 27, 2010

The Hometime crew works with surveyors, graders and architects to prepare a building site. Episode one of a thirty part series focusing on this well-designed, state-of-the-art home.

0.0 30 min
5. Stone Cottage – Concrete & Foam
Mar 6, 2010

The Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls.

0.0 30 min
6. Stone Cottage – Instant House
Mar 13, 2010

The Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at the job site on top of the foundation.

0.0 30 min
7. Stone Cottage – Roofscape
Mar 20, 2010

The Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, and finally hoisted into place.

0.0 30 min
8. Stone Cottage – Windows
Mar 27, 2010

The Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system.

0.0 30 min
9. Stone Cottage – Concrete Floors
Apr 3, 2010

The Hometime crew prepares for and supervises the installation of the basement, garage and porch floors.

0.0 30 min
10. Stone Cottage – Inner Workings
Apr 10, 2010

The Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the driveway, stonework and siding.

0.0 30 min
11. Stone Cottage – Insulation
Apr 17, 2010

The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation.

0.0 30 min
12. Stone Cottage – Geothermal
Apr 24, 2010

The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment.

0.0 30 min
13. His and Her Garage
Sep 11, 2010

The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for "him."

0.0 30 min
14. Stone Cottage -- Interior Walls
Sep 18, 2010

After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings.

0.0 30 min
15. Stone Cottage -- Vaulted Ceilings
Sep 25, 2010

The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms.

0.0 30 min
16. Stone Cottage -- Millwork
Oct 2, 2010

Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed.

0.0 30 min
17. Stone Cottage -- Exterior Doors
Oct 9, 2010

The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling.

0.0 30 min
18. Stone Cottage -- Tile
Oct 16, 2010

The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls.

0.0 30 min
19. Stone Cottage -- Driveway
Oct 23, 2010

The Hometime crew installs the paver driveway, as well as the master bathroom cabinets.

0.0 30 min
20. Stone Cottage -- Interior Doors
Oct 30, 2010

The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns.

0.0 30 min
21. Stone Cottage -- Laundry Room
Nov 6, 2010

The Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring.

0.0 30 min
22. Stone Cottage -- Office
Nov 13, 2010

The home office begins to take shape, as the custom staircase work begins.

0.0 30 min
23. Stone Cottage -- Countertops
Nov 20, 2010

The stone countertops are fabricated and installed.

0.0 30 min
24. Stone Cottage -- Fixtures and Appliances
Nov 27, 2010

The Hometime crew installs cabinets, countertops and landscaping.

0.0 30 min
25. Stone Cottage -- Retractable Screens
Jan 22, 2011

The covered porch gets motorized screens, the garage floor gets an epoxy coating, and the last few cabinets are installed.

0.0 30 min
26. Stone Cottage -- Sod and Stone
Jan 29, 2011

The custom handrail is built, granite countertops are installed, the drip irrigation is wrapped up, and the yard gets sod.

0.0 30 min
View this project on GitHub: https://github.com/Manasess896/TMDB-Explorer