This Old House

-

Season 33

Overview

Bedford; Barrington

Episodes

1. Bedford | Welcome to the Bedford Project
Oct 6, 2011

Work begins on a 300-year-old farmstead.

0.0 N/A min
2. Bedford | And the Work Begins
Oct 13, 2011

The crew transplantis shrubs and plants to a safe place until the job is complete. They also clear small trees and overgrowth that are in the way of the new family room addition.

0.0 26 min
3. Bedford | Work on the Addition Begins
Oct 20, 2011

The crew removes old clapboards and opens up a hole in the old fieldstone foundation that will connect the old basement space to the new. They also patch a rotted sill.

0.0 26 min
4. Bedford | New Entrance, Old Bricks
Oct 27, 2011

Framing up the new roof that will overlay the existing roof; repairing the exterior chimney; weaving in bricks.

0.0 26 min
5. Bedford | Yard and New Gable Wall
Nov 3, 2011

Work begins on clearing the backyard. The crew assembles and raises the gable wall for the family room addition and repairs a historic windowsill.

0.0 N/A min
6. Bedford | New Space Revealed
Nov 10, 2011

The family room addition is framed up and sheathed. The crew installs new post supports in the kitchen accommodate a new stove vent hood and repairs the window sash.

0.0 N/A min
7. Bedford | Insulation, Roofing
Nov 17, 2011

The crew tops off cellulose insulation in walls, builds raised beds out of fieldstone, and waterproofs the roof.

0.0 N/A min
8. Bedford | Kitchen Inspiration
Nov 24, 2011

General contractor Tom Silva replaces a rotted post. Window restoration specialist Alison Hardy reinstalls the restored historic window sashes. Host Kevin O'Connor finds electrician Allen Gallant upgrading the electrical service in the garage. Interior designers Dee Elms and Andrew Terrat show Kevin the house that inspired our kitchen. Tom and Kevin remove strip flooring to reveal historic boards.

0.0 N/A min
9. Bedford | A New Driveway
Dec 1, 2011

General contractor Tom Silva installs new red cedar clapboards. Plumbing and heating expert Richard Trethewey helps remove some existing plumbing in the old kitchen. Landscape contractor Roger Cook installs a new asphalt driveway that will later be topped with a rustic finish. Richard shows host Kevin O'Connor how he's solving a rough plumbing problem by using a wet vent in the powder room.

0.0 N/A min
10. Bedford | Interior Design Ideas
Dec 8, 2011

Tom and Norm rebuild the front door surround to eliminate rot. Roger oversees deep root injections to amend and aerate soil. Kevin tours the new space design and sees how it blends modern and rustic elements.

0.0 N/A min
11. Bedford | Milestones In and Out
Dec 15, 2011

Roger Installs a 3,000-pound slab of reclaimed granite for the front step. The crew installs new windows in the addition and insulates old ductwork. Roger spreads a rye grass mix.

0.0 N/A min
12. Bedford | A Major Milestone
Dec 22, 2011

The crew installs decorative timbers in the new family room along with an A/C condenser. Tom and Kevin fasten mahogany boards to the front entry deck and install a garden shed.

0.0 N/A min
13. Bedford | On the Right Path
Dec 29, 2011

Roger uses old-style bricks for a winding entry path. The crew works to fit a modern kitchen into an ell from the 1700s and installs a zero-clearance gas fireplace. On the outside wainscoting goes in and painting of the farmhouse begins.

0.0 N/A min
14. Bedford | Doors and Tabletops
Jan 5, 2012

The crew restores the panel front door with flexible epoxy and new paint. The new marble island top hides a secret feature, a hole in the top concealing a compost bin. Rich works on the upgrades to the ducted HVAC system. Norm uses two old doors to make sliding barn entry doors.

0.0 N/A min
15. Bedford | Final Touches
Jan 12, 2012

The crew finishes the driveway and installs a new LED strip light at the old fireplace. The home gets a Colonial-inspired boot scraper and doorknocker as well as a new hot water heater.

0.0 N/A min
16. Bedford | Final Reveal
Jan 19, 2012

Roger installs new and old plant material. The crew puts the finishing touches on the kitchen by installing ceramic backsplash tile and brightens up the parlor and dining room .

0.0 N/A min
17. Barrington; An Introduction
Jan 26, 2012

As the next project starts, demolition begins on the 1950s porch addition and the first floor is gutted.

0.0 N/A min
18. Barrington; Hurricane Irene
Feb 2, 2012

The crew prepares the house for Hurricane Irene and begins framing the second floor.

0.0 N/A min
19. Barrington; Building a Clambake!
Feb 9, 2012

Installing windows using a custom copper pan for flashing; installing architectural shingles.

0.0 N/A min
20. Barrington; A Newport Mansion
Feb 16, 2012

Exterior shingles; hydronic system integrated with a solar hot water system on the roof.

0.0 N/A min
21. Barrington; Coastal Landscape
Feb 23, 2012

Installing a custom copper gutter and scupper as well as coastal tolerant and native plants.

0.0 N/A min
22. Barrington; The Finishes Begin
Mar 1, 2012

The Brazilian hardwood garapa is installed on the new deck; red cedar shingles. Red oak flooring and decorative polyurethane brackets are installed.

0.0 26 min
23. Barrington; Cherry Kitchen
Mar 8, 2012

Replacing cracked asphalt with new concrete pavers in the driveway; using cherry veneers in the kitchen; wall cabinets; setting the new tub.

0.0 N/A min
24. Barrington; Wall Dressing
Mar 15, 2012

Retractable awning; Saratoga soapstone; light fixtures; electric floor warming system.

0.0 26 min
25. Barrington; The Finish Line
Mar 22, 2012

Glass tile; installing a garage storage system; cable railing system; installing a gas stove; LED down light.

0.0 26 min
26. Barrington; Another Project Wraps
Mar 29, 2012

Advanced programmable thermostat; solar shades; dividing the master closet into his and hers spaces; girl's room includes timeless pieces and colors.

0.0 26 min
View this project on GitHub: https://github.com/Manasess896/TMDB-Explorer