1. Jersey Shore Rebuilds 2013 Part 1: Sandy and the Jersey Shore
Oct 5, 2013

For the first time, This Old House takes on three homes at the same time. The team meets the homeowners and discusses rebuilding stronger, smarter, and safer.

0.0 N/A min
2. Jersey Shore Rebuilds 2013 Part 2: Drastic Measures
Oct 12, 2013

The team discusses how FEMA impacts building requirements, and foundation options. The Manasquan home is razed. Kevin takes a tour of Bay Head. Trouble begins at Point Pleasant.

0.0 N/A min
3. Jersey Shore Rebuilds 2013 Part 3: Getting to Work
Oct 19, 2013

The Mantoloking home is examined from a new angle while the Bay Head house begins framing. The team learns about a innovative foundation to be used on the Point Pleasant home. And the shows visits a business in Bay Head that has already successfully rebuilt.

0.0 N/A min
4. Jersey Shore Rebuilds 2013 Part 4: Built for Speed
Oct 26, 2013

The show visits the boardwalk at Seaside Heights to view reconstruction. The Bay Head home has a new deck installed. The Point Pleasant project gets crushed! A visit to the factory that will make the Manasquan house in only one week.

0.0 N/A min
5. Jersey Shore Rebuilds 2013 Part 5: Lines in the Sand
Nov 2, 2013

The windows are installed at the Bay Head house. At Point Pleasant a new dinning room is installed in place of the garage. And the modular home arrives on site in Manasquan.

0.0 N/A min
6. Jersey Shore Rebuilds 2013 Part 6: Go With the Flow
Nov 9, 2013

Breakaway walls and flood vents are installed at the Point Pleasant. The work on the modular home continues. What plants and trees survived Sandy?

0.0 N/A min
7. Jersey Shore Rebuilds 2013 Part 7: Stories From Sea Level
Nov 16, 2013

Footings are added in Bay Head home. Point Pleasant gets stone veneer, fiber-cement siding and composite decking. Manasquan project is finished. Pro surfer Sam Hammer visits the show. And marine biologist Chris Wojcik talks about the bay.

0.0 N/A min
8. Jersey Shore Rebuilds 2013 Part 8: One Year Later
Nov 23, 2013

A tour of the Mantoloking project. And the wrap party for the Jersey Shore projects.

0.0 N/A min
9. Arlington 2014: Part 1: A New Project
Jan 2, 2014

The crew begins work on Italianate-style home originally dating to 1872.

0.0 N/A min
10. Arlington 2014: Part 2: Old House Discoveries
Jan 9, 2014

Richard visits a water tank that has been disguised as a Greek temple. During demolition, the crew finds traces of the past. Roger moves a rhododendron .

0.0 N/A min
11. Arlington 2014: Part 3: Concrete Jungle
Jan 16, 2014

Kevin, Norm, Tom, and mason Mark McCullough replace the substandard foundation by pouring a new slab and curb, all while preserving the antique fieldstone foundation. The crew also finds headroom and original plaster details in the living room.

0.0 N/A min
12. Arlington 2014: Part 4: Quest for a Dry Basement
Jan 23, 2014

Tom joins the home's new roof to the existing. Architect David The architect explains how much change an 200 additional square feet the house. The existing fieldstone foundation gets additional repairs and waterproofing. Roger tours a nearby Garden. Norm and Tom repair the front door.

0.0 N/A min
13. Arlington 2014: Part 5: Getting to Level
Feb 1, 2014

Leveling the ceiling in the kitchen and the floor in the finished basement is explained. An opening for a new window is cut. Landscape architect Cricket Beauregard explains what to do with a shady front yard.

0.0 N/A min
14. Arlington 2014: Part 6: Additional Details
Feb 8, 2014

The new kitchen windows are inspected. Cast iron waste pipes are installed with a traditional lead and oakum joint. Outside -- trim is replicated and new siding is installed.

0.0 N/A min
15. Arlington 2014: Part 7: Arlington Heights
Feb 15, 2014

Selective tree pruning occurs in the yard. Inside, Richard explains the choice between PEX and copper for water supply lines. Kevin tours an 1872 Stick Style home.

0.0 N/A min
16. Arlington 2014: Part 8: Italianate Inspiration
Feb 22, 2014

Exterior colors are proposed. A tour of a nearby 1870 Italianate style home. Richard shows a more attractive approach to PVC vents. Tom shows his favorite applications for radiant heat.

0.0 N/A min
17. Arlington 2014: Part 9: Deadliest Old House?
Mar 1, 2014

A "Deadliest Catch" star drops by to help with plaster cracks. Making the second floor railing safer.

0.0 N/A min
18. Arlington 2014: Part 10: Old World New World
Mar 8, 2014

Installing steps with ice. More plaster repairs. The use of 3D-printing for home repair. Review of the front porch design.

0.0 N/A min
19. Arlington 2014: Part 11: House vs. Nature
Mar 15, 2014

A hydrangea that is damaging the foundation is removed. Painting with red paint. How to keep the basement dry.

0.0 N/A min
20. Arlington 2014: Part 12: Water Water Everywhere
Mar 22, 2014

A visit to Spy Pond in Massachusetts. A new water main is installed. Chestnut flooring is selected. Fiberglass gutters that appear appropriate to the historical period are installed.

0.0 N/A min
21. Arlington 2014: Part 13: Brick, Trim and Tile
Mar 29, 2014

A sidewalk is prepared. Custom moldings are installed. Tiles are picked by the homeowner. New doors and countertops are installed.

0.0 N/A min
22. Arlington 2014: Part 14: Soapstone, Marble, Oval Picture Frame
Apr 5, 2014

Adding the final edge detail to soapstone countertops; cutting down 12-inch marble tiles for wainscoting; oval mirror frame; oak stair treads; darkening soapstone countertops with carnauba wax and walnut oil.

0.0 N/A min
23. Arlington 2014: Part 15: Made in the Shade
Apr 12, 2014

Installing a custom PVC fence and arbor; creating a marble herringbone pattern in the powder room; grout options for the faux slate floor in the mudroom; building a sliding barn door; alternatives to the usual shade plants.

0.0 N/A min
24. Arlington 2014: Part 16: Decorative Details
Apr 19, 2014

A teak island top is installed in the kitchen; a vanity top is added to the master bath; an electronics nook is built; the pebble tiles on the shower floor are grouted; handmade wallpaper is hung; and a new front door is installed.

0.0 N/A min
25. Arlington 2014: Part 17: Sod, Garbage Disposers, Crown Molding
Apr 26, 2014

A truckload of fresh sod is rolled out; a replica ceiling medallion made with a 3D printer and a custom copper vent hood are installed; a garbage disposer is selected; a pedestal sink is installed in the powder room; and storage space in the master closet is maximized. Also: a lesson in crown molding.

0.0 N/A min
26. Arlington 2014: Part 18: Italianate Renaissance
May 3, 2014

The Arlington Italianate project concludes with a look at how the master bath was modified to accommodate a steam shower; a tour of the basement, bedrooms, baths and laundry spaces; and an overview of the decor choices.

0.0 N/A min